Assembling


The assembling-time of a CD20 building is shorter than any other precast concrete system.
Construction site costs, total construction time and construction interest are therefore reduced significantly.

CD20-Building Systems takes care of all the logistic coordination, delivery on demand and time schedules.
The specialized assembly company works with qualified and certified assembling teams.

Impression video of the assembly of the CD20-structure for the Moller-College in Steenbergen, the Netherlands: 
Total 4100 m² gross floor area in two constructional layers, assembled in only 2.5 weeks.