CD20-system
with parapets and filling facades
4 storeys erected in 9 days
|
CD20-system
floorslabs 9m with loadbearing facades
11 storeys erected in 43 days
|
CD20-system
precast foundation + steelconstruction
3 storeys erected in 20 days |
Hybrid CD20-system
loadbearing facades, gymn-floor
4 storeys erected in 20 days
|
Hybrid CD20-system
cantilever beams, ornamental facades
7 storeys erected in 35 days
|
Hybrid CD20-system
slanted greenroof, with precast foundation
2 storeys erected in 14 days
|
Hybrid precast system
floorslabs with loadbearing facades
hollowcore floorslabs on beams + columns |
Conventional precast system
load-bearing parapets with hollowcore slabs
on steel beams + columns |
|